A Voyager Case Study: EoL CM400 to Clout FileNet

The move from an end-of-life system to a modern, cloud-native solution comes with many benefits. Upgrading legacy systems comes hand-in-hand with a more efficient, effective approach to processes and functions, while saving on complexity and cost of operations. You can realise the full potential of your valuable business data through [...]

2021-09-29T10:35:31+00:00September 29th, 2021|Case Study - not IV|

IBM ECM migration and system consolidation

IBM ECM migration and system consolidation Customer Challenge Our client - a large international bank - piled up a complex and heterogeneous ECM infrastructure, with multiple systems and document repositories. For years the bank was using an old FileNet Imaging Service (IS) to store documents and a newer IBM FileNet Content Engine (CE) 4.2 to [...]

2018-01-11T14:26:58+00:00July 12th, 2017|Case Study, Case Study - not IV, Case Study-Fin|

Synchronization over satellite connections

Synchronization over satellite connections CUSTOMER CHALLENGE Petrofac, just as other companies in the oil and gas industry, has project sites with limited infrastructure in remote locations far away from the central or operational offices. However, a constant on-line connection between these sites is a must, since all these sites constantly need to exchange business documents [...]

2018-01-11T14:27:26+00:00May 5th, 2017|Case Study, Case Study - not IV, Case Study-Energ|

Migration to EMC Documentum 6.5

EMC Documentum upgrade migration CUSTOMER CHALLENGE Or client, Raiffeisen Leasing manages all Raiffeisen's leasing and a wide range of financing operations. Their intensive day to day document flow produced more than 300.000 various documents (300+ GB of data), all stored in an aging, unregulated EMC Documentum 5.3 repository. At the same time a large part [...]

2018-01-11T14:28:26+00:00May 5th, 2017|Case Study, Case Study - not IV, Case Study-Fin|

Migration to LiveLink & data clean-up

Migration to LiveLink & data clean-up CUSTOMER CHALLENGE Deploying a new corporate ECM system (Opentext Livelink) at a Telenor branch, with approximately 1500 employes, and migrating, with the smallest possible business downtime, around 1.5 TB / 3,1 million individual files of user generated content into a new single content repository while preserving the initial data structure, the [...]

2018-01-11T13:43:47+00:00May 5th, 2017|Case Study, Case Study - not IV, Case Study-Telco|

Lotus Notes to EMC Documentum migration

Lotus Notes to EMC Documentum migration CUSTOMER CHALLENGE Our client (MAVIR) had app. 1 TB, (2.3 million individual files) of unstructured documents and business data stored across a heterogeneous corporate IT system (including Novell based shared drives, Lotus Notes databases, file and registry systems, workstations). To improve their corporate document management MAVIR introduced a new [...]

2018-01-11T14:28:55+00:00May 5th, 2017|Case Study, Case Study - not IV, Case Study-Energ|

Upgrade migration: EMC Documentum 5.2 to 6.7

EMC Documentum upgrade migration Customer Challenge Over the years our client - Gedeon Richter piled up a massive amount of various medicine descriptions, patient information leaflet texts, research documentations, and other documents containing medical and client information all written in various languages, since Gedeon Richter operates in 38 countries. All this data was stored in [...]

2018-01-11T14:30:17+00:00May 5th, 2017|Case Study, Case Study - not IV, Case Study-Pharma|
Go to Top